OIL AND GAS PRODUCTION FACILITIES – ENGINEERING
- As-built campaign project-trans Ramos pipeline and isolation procedure associated flowstions and manifolds (opukushi, benisede,brass creek, tunu, ogbotobo and ramos river)
- As-built campaign project – Trans Escravos Pipeline And Isolation Procedure and Associated Flowstions And Manifolds
- Chemical Laboratory Shade for Storage Drums Protection
- 2” Pipe Support with Weather Protection Cover
- New 4” Jet Fuel Transfer Inlet Line (Pump A)
- New 4 Jet Fuel Transfer Inlet Line (Pump B)
- Clamp/ Repair pin hole on 4” Condensate line at MP-D_230
- Replacement of Leaking Fire Water Monitor Line at Asabo
- Piping Modification of MB Turbine Meter at ASABO MP
- Piping Modification for Installation of SDV on HP Gas Line
- Replacement of 16” Corroded Gas Line MG-MP
- Convert OSO RB Production to Injectors
- CAT #2 generator exhaust piping modification
