As-built campaign project-trans Ramos pipeline and isolation procedure associated flowstions and manifolds (opukushi, benisede,brass creek, tunu, ogbotobo and ramos river)
-
As-built campaign project-trans Ramos pipeline and isolation procedure associated flowstions and manifolds (opukushi, benisede,brass creek, tunu, ogbotobo and ramos river)
View MoreJuly 9, 2017 -
As-built campaign project – Trans Escravos Pipeline And Isolation Procedure and Associated Flowstions And Manifolds
View MoreJuly 9, 2017 -
Chemical Laboratory Shade for Storage Drums Protection
View MoreJuly 9, 2017 -
2” Pipe Support with Weather Protection Cover
View MoreJuly 9, 2017 -
New 4” Jet Fuel Transfer Inlet Line (Pump A)
View MoreApril 20, 2015 -
New 4 Jet Fuel Transfer Inlet Line (Pump B)
View MoreApril 20, 2015 -
Clamp/ Repair pin hole on 4” Condensate line at MP-D_230
View MoreApril 20, 2015 -
Replacement of Leaking Fire Water Monitor Line at Asabo
View MoreApril 20, 2015 -
Piping Modification of MB Turbine Meter at ASABO MP
View MoreApril 20, 2015 -
Piping Modification for Installation of SDV on HP Gas Line
View MoreMarch 26, 2015
- 1
- 2
