Repair of Oron Pipeline Pig Launcher Barrel Door and 24”x600# Manual Ball Valve.

Petrotema’s Scope of Work

  • Servicing of valves body adaptors, greasing/ Adaptor (Closure)
  • Servicing of gearbox/ Manual Operator
  • Cleaning the build up in the seat area due to line contaminants
  • Servicing of ball and replacement of faulty adapter O rings/seals
  • Injecting grease through nipples using industrial grease gun
  • Checking the integrity of ball valve and confirm it fully opens and closes
  • Installation of 24’’ x 600# RF blind flanges/ 24’’ x 600# metal gasket
  • Conducted first hydrostatic seat/shell test at PTEL equipment base
  • Second hydrostatic seat /shell test witnessed by Seven Energy representative (Julius Okitikpi) at same location

PROJECT DETAILS

Client: Seven Energy
Location: Uquo Field /Nigeria
Project Status Completed
Date Completed: 06/09/2015
Purchase Order No.: REF: Accugas@001323v2