Petrotema’s Scope of Work
- Detailed Site Investigations Visit/Scoping
- Site Assessment Report
- Dismantle of 8” manual valve gearbox/repair of damage gears on pressure relief headed
- Dismantle of 6×4” KF manual valve gearbox/repair of damage gears on pressure relief headed
- Installation repair of damage 8” manual ball valves on pressure relief headed downstream PSV-110A
- Greasing
- Dismantle of 12” Upstream outlet manual valve gearbox and repair (SEP-201)
- Dismantle/servicing of 18” Pig receiver manual valve gearbox
- Servicing of gearbox and greasing14’’ Upstream outlet manual valve BAP100
- Servicing of gearbox and greasing14’’ downstream outlet manual valve BAP101
- Servicing of gearbox and greasing18” Pig receiver manual valve
- Servicing of gearbox and greasing 6” Pig receiver kicker line ball valve
- Installation/greasing of 6×4” KF manual valve gearbox on pressure relief headed
- Servicing of gearbox and greasing14’’ downstream outlet manual valve BAP100
- Servicing of gearbox and greasing14’’ upstream outlet manual valve BAP101
- Installation/greasing of gearbox 12’’ inlet filter ball valve ( SEP-201)
- Testing/handing over