Petrotema’s Scope of Work
- Detailed Site Investigations Visit/Scoping
- Site Assessment Report – record of the observations, findings, requirements and recommendations
- Detailed Site Survey
- Verification and Mark Up of Existing Drawings
- Review, Validating & Review all P&ID Drawing Affected by New Modifications
- Developed Site Sketch
- Developed scope of work for new Piping Modification
- Carry out Detailed Design -Developing piping layout drawings showing the tie-in locations and location of existing installations (fire water lines and cathodic protection cables) to avoided damage to during installation,
- Developing Isometric drawing, tie-in and demolition drawings
- Developing pipe rack detailed and pipe rack foundation drawings for specific locations not typical
- Material Take off List Based on ExxonMobil GPS
- Dimensional Verification
- Carry out Constructability Studies
- Generate Fabrication Drawings