New 4 Jet Fuel Transfer Inlet Line (Pump B)

Petrotema’s Scope of Work

Installation of 2nos new pipelines (tank 201 suction and discharge lines) from 8” diesel inlet and 6” diesel outlet headers to jet fuel pump A & B

  • Detailed Site Investigations Visit/Scoping
  •  Site Assessment Report – record of the observations, findings, requirements and recommendations
  • Detailed Site Survey
  • Verification and Mark Up of Existing Drawings
  • Review, Validating & Review all P&ID Drawing Affected by New Modifications
  • Developed Site Sketch
  • Developed scope of work for new Piping Modification
  • Carry out Detailed Design -Developing piping layout drawings showing the tie-in locations and location of existing installations (fire water lines and cathodic protection cables) to avoided damage to during installation,
  • Developing Isometric drawing, tie-in and demolition drawings
  • Developing pipe rack detailed and pipe rack foundation drawings for specific locations not typical
  • Material Take off List Based on ExxonMobil GPS
  • Dimensional Verification
  • Carry out Constructability Studies
  • Generate Fabrication Drawings

PROJECT DETAILS

Client: ExxonMobil
Location: Qua Iboe Terminal
Project Status Completed
Date Completed: 23/09/2016
Purchase Order No.: PO_4501237548