Petrotema’s Scope of Work
- Carry site survey/inspection on tie-in manifold and flowstations along trans Ramos pipeline ROW
- Prepare site survey/inspection report
- Developed Markup drawing during site visit.
- Prepare Isolation procedure of Trans Ramos Pipeline
- Review and update all existing drawings accordance the site mark up As built (Hard and soft copies) for Trans Ramos Pipeline (Opukushi, Benisede, Brass Creek, Tunu, Ogbotobo and Ramos River)
- Managed Community Affairs, Security and Related Matters
- Provide Marine logistic for the project.
PROJECT DETAILS
| Client: | MOTAK/SPDC Petrotema’s Role: Subcontractor |
|---|---|
| Location: | Niger delta region, Nigeria |
| Project Status | Completed |
| Date Completed: | 28/09/2012 |
| Purchase Order No.: | P1201/MT/12/002 |